This page contains links to the Campus Design and Construction Guidelines. These Guidelines have been prepared for the use of designers preparing bid documents.
Designers are expected to download and use all applicable Guidelines with their respective projects. Note: all four categories of guidelines below apply to UNC Pembroke campus projects and the authority having jurisdiction for design review, life safety, electrical and fire alarm inspections for campus projects is the North Carolina State Construction Office (Raleigh, NC) and the UNC System (Chapel Hill, NC), in addition to the design team and owner. The North Carolina DOL inspects elevators and boilers. All (Formal & Informal) project plans are reviewed electronically for code compliance, etc. and change orders (Formal projects only) are processed online in Interscope+.
State of North Carolina, UNC System and UNC Pembroke Guidelines:
2. State Construction Standards- Forms and Documents - for access to guidelines and templates for state of NC/UNC system projects: general conditions contracts, guidelines for: energy and sustainability, asbestos abatement, electrical & solid state lighting, fire alarm, masonry mortar, site preparation & grading, commissioning & performance verification, energy performance modeling & reporting, water conservation, LCCA, roofing, special inspections, water-based (fire sprinkler) fire protection and telecom.
3. UNC System Standards- Forms and Documents - for access to guidelines and templates for state of NC/UNC system projects: high performance buildings best practices, HUB/MBE forms, insurance certificate provisions, informal project manual change order form.
4. UNC Pembroke Standards, below:
A. Digging & Trenching Request
B. Hot Work Permit
C. Key Request Form
D. Utility Service Interruption Request
Division | Title | Date |
---|---|---|
00- Planning & Design | Classroom Design | 03-17-2020 (Draft) |
00- Planning & Design | Closeout & Record Documents | 08-17-2020 (Draft) |
00- Planning & Design | Preferred Manufacturer List | pending |
00- Planning & Design | Space Inventory Standards | 10-00-2015 |
01- General Requirements | Supplemental Conditions | pending |
02- Existing Conditions | Reuse, Recycling & Hazardous Waste | pending |
03- Concrete | ||
04- Masonry | ||
05- Metals | ||
06- Wood, Plastics, Composites | ||
07- Thermal & Moisture Protection | ||
08- Openings (Door Hardware) | ||
09- Finishes | ||
10- Specialties | ||
11- Equipment | ||
12- Furnishings | ||
13- Special Construction | ||
14- Conveying Equipment | ||
21- Fire Suppression | ||
22- Plumbing | ||
23- HVAC | ||
25- Integrated Automation | ||
26- Electrical | ||
27- Communications | Telecommunications Cabling Specifications | 2017-2018 (Draft) |
28- Electronic Safety & Security | ||
31- Earthwork | ||
32- Exterior Improvements | ||
33- Utilities | ||